Road 01
Buy new electric
- High Capex, often €250K+ per unit
- 12 to 24 months delivery
- Working assets scrapped early
Own tomorrow.Protect today.
Electrify the terminal tractors you already own, with one partner for energy, finance and fleet.
Diesel to electric conversion, completed on site in four days. No new vehicle purchase. No operational disruption. Immediate return to service.
● In motion
Real footage from a live ro-ro terminal: a drone test flight over the converted fleet, and the full story of the first electrified 4×4 terminal tractor.
01 Why convert
Ready Electric by Portunus converts your existing diesel terminal tractors to fully electric, CE-certified drive, at your terminal. The chassis, cab, axles and brakes stay. Only the powertrain changes, so you never have to gamble on which battery technology wins.
Road 01
Road 02
Road 03 · Ready Electric
02 The conversion
Our engineers come to your terminal. No new vehicle, no new operator training, no new spare-parts universe. Drag to compare the same machine, before and after.
Before · Diesel
After · Ready Electric
Drag to compare
Inspection, sizing and documentation agreed.
Engine, transmission and fuel system removed.
One pre-assembled unit. No cutting, no welding.
HV safety checks, load testing, signed off.
Duration may vary with site conditions and model.
03 Proof & certification
Every converted machine is re-assessed and re-certified to EU legislation, with independent assessment of the high-voltage system. And it is not a prototype: converted units pull loaded trailers up ferry ramps every day, alongside the existing fleet.
NuvoCert EC certificate2006/42/EC · 2014/30/EU · 2014/35/EU
Third-party evaluation of system integration, HV safety and performance.
Every mechanical and electrical integration point verified before commissioning.
Load tests and continuous duty cycles in live port operations.

The electrified machine offers higher performance than its diesel version, and it's much quieter and smoother to operate.Süleyman Göktaş · Terminal tractor operator, DFDS

We've made the machine more efficient and easier to maintain, with lower costs.Ufuk Buga · Workshop supervisor, DFDS
04 Technology
Three proven building blocks, engineered into the fleet you already run.
Battery, motor, inverter, thermal management and all HV safety systems in one pre-assembled unit. It drops into the existing chassis, no structural modification.
Lithium iron phosphate cells from CATL, trusted by global OEMs. Up to 310 kWh, liquid-cooled, sized for real-shift endurance.
Peak shaving, load balancing and less grid dependency, so you charge the fleet without overloading your connection.
Built to perform.
Backed to last.
05 The economics
Electrification has to make financial sense, not only environmental. Estimate your fleet, then let us model it properly.
Illustrative only. Assumes 300 operating days, about 3.4 kWh per litre of diesel replaced, and around 40% lower maintenance on €10,000 per unit per year.
One partner beyond the conversion, so you never coordinate many suppliers.
06 Questions
The questions operators and boards ask first. Technical, energy, finance and funding answers are on the FAQ page.
See all questionsAbout four working days per unit, on site. Days 1 to 2 remove the diesel powertrain, day 3 installs the cradle, day 4 covers integration, safety checks and functional testing.
Ready Electric is validated for Terberg and similar-platform terminal tractors, the most common port architectures in Europe. We confirm your models and years during the assessment.
Yes. Each conversion is re-assessed and re-certified to the EU Machinery Directive 2006/42/EC and relevant harmonised standards, with independent assessment of the high-voltage system.
Yes. Our mobile team comes to you. A standard workshop bay or an equivalent covered area is all that is needed.
07 The Ready Tool Kit
08 Talk to your local European team
Engineering, financing, powering and managing the transition. One partner for every step.
If it doesn't open, download it here.